Client/Owner
Project Description
Project Challenges
The proposed storm main tied into and existing system that outflowed into a highly sensitive environment. It was of utmost concern to ensure that no damage was being done to the existing eco habitat as a result of these works. The pipe along 48th avenue was very deep and 48th ave was a busy road. Worker safety and traffic management were imperative to the performance of this job.
Responsibilites
• Regular Owner Meetings.
• Generating Safety Procedure for Excavations Over 10’ Deep.
• Maintaining Public Relationships. Quality Control.
• Engineer Reviews and Training of Jr Project Manager.
• Ensuring Sub and Supplier Paper Work was collected to verify against invoicing.
• Reviewing and monitoring daily time for accuracy and value.